Fabbster 3D printer: Difference between revisions

The educational technology and digital learning wiki
Jump to navigation Jump to search
Line 18: Line 18:
The fabbster is a kind of modified [http://www.reprap.org/wiki/Mendel Mendel design] that targets the home market.
The fabbster is a kind of modified [http://www.reprap.org/wiki/Mendel Mendel design] that targets the home market.


[[image:fabbster-picture.jpg|frame|none|Picture taken from the [http://www.fabbster.com/forum.php?aid=825842962&pid=56 fabster forum] ]]
[[image:fabbster-picture.jpg|thumb|300px|right|Picture taken from the [http://www.fabbster.com/forum.php?aid=825842962&pid=56 fabster forum] ]]


=== Where and what ===
=== Where and what ===

Revision as of 01:31, 1 May 2012

<pageby comments="false"/>

The Fabbster is a low cost 3D printer kit that can be assembled by people with some do-it-yourself skills.

Important. This article refers to a "pilot program" printer and the draft manual version 1.10 and not the "final" home-user version.

See also:

- Daniel K. Schneider 14:11, 24 April 2012

The fabbster kit

The fabbster is a kind of modified Mendel design that targets the home market.

Picture taken from the fabster forum

Where and what

Getting it The kit is sold through retailers and costs about 1500 € (incl. VAT., e.g. here). It will be shipped sometimes soon (May 2012?). I got ours for 500 € through their (March 2012) pilot program.

Software

  • A basic slicer program (STL to machine code configurator/translator) from Netfabb is included in the price. The machine code is closed source and not documented, meaning that you will have to use this Netfabb program.
  • The printer comes with an electronic box that can print either through a connected PC or via a SD card. You also can put a file on the SD, then launch it from the PC (this is better solution for large files)
  • Driver software for Windows XP/VISTA/7 can be downloaded from the wiki.

Materials

  • Custom made ABS sticks or 3mm ABS rolls
  • PLA sticks or rolls

The parts

Unlike the RapMan, the fabbster is based on very few different kinds of parts:

  • Most of the structure uses so-called "cassettes", i.e. good for most everything 8.5x7.6cm plastic parts
  • Most screws and bolts have the same size.

Assembly

The assembly manual

  • Assembly is described in a bilingual German/English assembly handbook (Version 1.10 is a color PDF file in A4 portrait format and includes 57 pages and about 42 for the assembly process itself.
  • Steps are explained on sheets that included the following information:
    • Parts (prepare them first)
    • A graphic explaining the assembly step
    • Some detail views
    • A global progress view

Other documentation

  • Wiki
  • support forums

Build time depends:

  • On your DYI skills
  • On your technical reading skills
  • On your capacity to follow instructions (undoing is easy, but adds time)
  • On how well you want it to be done
  • On how fast (without breaks etc) you plan to work

In my opinion, it can be anything between three and thirty hours (or more if you make a lot of mistakes). It took me about 22 hours (including initial testing, wiki writing etc.). Pure assembling therefore took less. But I do count problem-solving and basic testing as "build time".

Important: Build time refers to the pilot version. The final home-user version should take much less time.

Quality of the draft manual The manual should be improved a bit:

  • some mistakes must be fixed,
  • some explanations must be added,
  • Insert upfront a graphic that labels the most important elements (axis, names of the motors). e.g. see this. Users must understand what they are building. Some won't ....

Quality of parts of the pilot model

  • Some parts don't fit well: Fabbster is in the process of fixing this
  • 1-2 parts need a redesign: Fabbster is in the process of fixing this
  • The testing/calibration/software installation part is currently badly documented: Fabbster will fix this too I hope :)

If I had to assemble a second one, I'd certainly do it in 4 hours but then I wouldn't. Once every two years is enough (see RapMan).

Links

Official