Methodology tutorial - planning techniques: Difference between revisions

The educational technology and digital learning wiki
Jump to navigation Jump to search
Line 43: Line 43:
* For each WP, you should provide an estimation in man/days or man/weeks it takes to finish
* For each WP, you should provide an estimation in man/days or man/weeks it takes to finish
* A work package usually relates to a stage of the research plan, e.g. "the research plan", "field work", "development work".
* A work package usually relates to a stage of the research plan, e.g. "the research plan", "field work", "development work".
* If possible, a work package should depend little on parrallel work packages
* If possible, a work package should depend little on parallel work packages
* Each work package can lead to a "milestone" (an important stage in your research plan") and/or to deliverables, e.g. tangible products such as "research plan".
* Each work package can lead to a "milestone" (an important stage in your research plan") and/or to deliverables, e.g. tangible products such as "research plan".


Line 54: Line 54:
=== Activity diagrams ===
=== Activity diagrams ===


Activity diagrmas allow to better estimate the time it takes to reach an important stage and the global time needed.
Activity diagrams allow to better estimate the time it takes to reach an important stage and the global time needed.


The most well know methods are:
The most well know methods are:
Line 67: Line 67:
* Then you also add mile stones, i.e. the completion of a group of tasks and that represent the end of an important stage.
* Then you also add mile stones, i.e. the completion of a group of tasks and that represent the end of an important stage.


Here is a simple PERT-like graphic. It's in French, but should be easy to understant "jour" means "day". "Milestone 1 - Exploration" is done after you completed becoming familiar with the domain of study (5 days), after you studied an example (3 days), you found some references (3 days) and you though hard about finding an appropriate approach (3 days). "Milestone 2 - a project draft" needs and extra 5 days.
Here is a simple PERT-like graphic. It's in French, but should be easy to understand:
* "jour" means "day".  
* "Milestone 1 - Exploration" is done after you completed becoming familiar with the domain of study (5 days), after you studied an example (3 days), you found some references (3 days) and you thought hard about finding an appropriate approach (3 days).  
* "Milestone 2 - a project draft" needs and extra 5 days.


[[Image:book-research-design-257.png]]
[[Image:pert-chart-example-fr.png]]
 
... you have to figure out what elements you need. The important thing is '''to include every single activity that is directly or indirectly related to your thesis work'''. This includes taking out your
advisor for drinks and revising your English at the end.


=== Bar Charts ===
=== Bar Charts ===
Line 97: Line 103:
! rowspan="1" colspan="1" |...
! rowspan="1" colspan="1" |...
! rowspan="1" colspan="1" |...
! rowspan="1" colspan="1" |...
! rowspan="1" colspan="1" |
! rowspan="1" colspan="1" |...
! rowspan="1" colspan="1" |
! rowspan="1" colspan="1" |...
! rowspan="1" colspan="1" |
! rowspan="1" colspan="1" |...
! rowspan="1" colspan="1" |
! rowspan="1" colspan="1" |...
! rowspan="1" colspan="1" |jun 1 09
! rowspan="1" colspan="1" |jun 1 09
|-
|-
| rowspan="1" colspan="1" |.....
| rowspan="1" colspan="1" |Exploration of the subject area
| rowspan="1" colspan="2" |xxxxxxxxxx
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
Line 114: Line 121:
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
|-
| rowspan="1" colspan="1" |.....
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
|-
| rowspan="1" colspan="1" |Exploration of the subject area
| rowspan="1" colspan="2" |xxxxxxxxxx
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
Line 200: Line 206:
|}
|}


== Controlling ==


If you plan without planning to use this plan, forget it. You only will loose your time.


== Contrôle (Controlling) ==
; By whom ?


* In industry it's the boss or the project group as a whole that does it.
* Depending on the educational institution it's '''you''' mostly, but you may give it to your advisor or integrate it into the research proposal.


; Progress monitoring


=== Par qui ? ===
I suggest to compare reality with planning about once / month (or once/week if you thesis must be completed in just a few month.


* Dans l’industrie c’est le chef (ou encore le groupe) qui le fait,
If there are important deviations from schedule, you should understand why and take corrective action.
* ici vous êtes responsable principal !
* Si vous faites un plan, donnez-le au rapporteur (ou intégrez-le dans la proposition)


; Crisis management


* Ask help from your advisor
* Negotiate how to do less
* Adapt the approach for something that is less costly


=== Monitoring du progrès: ===
== Duration of a typical master thesis ===


* comparaison entre plan et réalité tous les mois
(adjust to your institution and type of work)
* identification des raisons de déviation et actions correctrices
** vos problèmes ne vont pas s’arranger seuls (!!)


Below is an example for a qualitative field-study.
Estimations are in man/month. So divide by the % of time you can spend on the thesis.


 
{| border="1"
=== Gestion des crises: ===
! rowspan="1" colspan="1" |Tasks (large WPs)
 
! rowspan="1" colspan="1" |By element
* demandez de l’aide au directeur
! rowspan="1" colspan="1" |Total
* négociez une redimension de votre projet si nécessaire
* adaptez l’approche si (vraiment) nécessaire
* Note: Des crises sont presques inévitables, mais un bon plan de recherche diminue les
risques et limite les dégats ....
 
 
 
== Estimation de la durée d’un projet typique ==
 
Eléments de calcul:
 
{|
! rowspan="1" colspan="1" |
tâches
! rowspan="1" colspan="1" |
par élément
! rowspan="1" colspan="1" |
total
|-
|-
| rowspan="1" colspan="1" |Find a subject and do the research plan
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
* Chercher un sujet et faire le plan de recherche
| rowspan="1" colspan="1" |1 month
| rowspan="1" colspan="1" |
 
| rowspan="1" colspan="1" |
1 mois
|-
|-
| rowspan="1" colspan="1" |Literature review and initial writing
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
* littérature et début de rédaction
| rowspan="1" colspan="1" |1 month
| rowspan="1" colspan="1" |
 
| rowspan="1" colspan="1" |
1 mois
|-
|-
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |Contact each research site
* contacter les sites (cas par cas)
| rowspan="1" colspan="1" |1/2 day
| rowspan="1" colspan="1" |
| rowspan="2" colspan="1" |1 month
1/2 journée
| rowspan="2" colspan="1" |
1 mois
|-
|-
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |Site visits
* visite d’un site
| rowspan="1" colspan="1" |1 day
| rowspan="1" colspan="1" |
1 journée
|-
|-
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |Coding of data
* codage et exploitation primaire d’une visite
| rowspan="1" colspan="1" |2-3 days
| rowspan="1" colspan="1" |
| rowspan="2" colspan="1" |1 month
2-3 jours
| rowspan="2" colspan="1" |
1 mois
|-
|-
| rowspan="1" colspan="1" |Analysis (matrices and visualizations)
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
* analyses synthétiques / visualisations globales
| rowspan="1" colspan="1" |
|-
|-
| rowspan="1" colspan="1" |Draft thesis
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
* rédaction du rapport (1ère version)
| rowspan="1" colspan="1" |1 month
| rowspan="1" colspan="1" |
 
| rowspan="1" colspan="1" |
1 mois
|-
|-
| rowspan="1" colspan="1" |Revisions
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
* révisions
| rowspan="1" colspan="1" |1 month
| rowspan="1" colspan="1" |
 
| rowspan="1" colspan="1" |
1 mois
|-
|-
| rowspan="1" colspan="1" |Total
| rowspan="1" colspan="1" |
| rowspan="1" colspan="1" |
* Total
| rowspan="1" colspan="1" |6 month
| rowspan="1" colspan="1" |
 
| rowspan="1" colspan="1" |
6 mois
|}
|}


[[Image:book-research-design-258.png]] vous êtes trop optimistes !!
[[Image:icon-hand-right.png]] It is likely to be over-optimistic
 
[[Image:book-research-design-259.png]] N’analysez pas trop de cas / sous-cas pour un
travail de licence ou de diplôme !
 
... ou alors utilisez une démarche quantitative


[[Image:icon-light-bulb.png]] Select as little cases you can get away with if you do a qualitative study or rather adopt a quantitative approach.


[[Category: research methodologies]]
[[Category: research methodologies]]
[[Category: tutorials]]
[[Category: tutorials]]

Revision as of 16:32, 10 October 2008

This article or section is currently under construction

In principle, someone is working on it and there should be a better version in a not so distant future.
If you want to modify this page, please discuss it with the person working on it (see the "history")

(translation needed)

Introduction

Learning goals
  • Learn how to make simple GANTT charts
  • Learn about PERTT charts
  • Get some other advice
Prerequisites
  • None
Moving on
Level and target population
Quality
  • low (translation needed)

It is not necessary to use some real project management technique, but doing so could help getting your thesis done in time. The main advantages good planning are:

  • Better estimation of resources (time), i.e. a good planning effort will likely tell you to reduce the scope of your research.
  • A tool for elf-control. If at some point you really are way behind schedule you have an opportunity to act.

The minimum

Create

  1. A list of things to do (workpackages)
  2. Deadlines for each
  3. Time needed for each

Then create a todo / start / deadline list, e.g. something like:

  • Literature review: start = oct 2020, end = feb 2021, volume = 1 man/month
  • Case study 1 field work: start = ....

Scheduling

Scheduling means to do the following.

  • You will have to divide a project into task, called "work packages" (WPs)
  • For each WP, you should provide an estimation in man/days or man/weeks it takes to finish
  • A work package usually relates to a stage of the research plan, e.g. "the research plan", "field work", "development work".
  • If possible, a work package should depend little on parallel work packages
  • Each work package can lead to a "milestone" (an important stage in your research plan") and/or to deliverables, e.g. tangible products such as "research plan".

To manage this scheduling process you then work with two (related kinds of graphics):

  • An activity diagram that shows dependencies of work packages and a critical path.
  • A bar diagram that illustrates activities over time

Planning also can include taking into account possible disasters.

Activity diagrams

Activity diagrams allow to better estimate the time it takes to reach an important stage and the global time needed.

The most well know methods are:

  • PERT (Program Evaluation and Review Technique)
  • CPM (Critical Path Method)
A simple example
  • Each project is represented as a directed graph of tasks (the rectangles)
  • Some tasks depend on other tasks
  • For each task you must estimate its duration. Often you do this with three figures: expected minimum, most expected time and expected worst case.
  • Then you also add mile stones, i.e. the completion of a group of tasks and that represent the end of an important stage.

Here is a simple PERT-like graphic. It's in French, but should be easy to understand:

  • "jour" means "day".
  • "Milestone 1 - Exploration" is done after you completed becoming familiar with the domain of study (5 days), after you studied an example (3 days), you found some references (3 days) and you thought hard about finding an appropriate approach (3 days).
  • "Milestone 2 - a project draft" needs and extra 5 days.

Pert-chart-example-fr.png

... you have to figure out what elements you need. The important thing is to include every single activity that is directly or indirectly related to your thesis work. This includes taking out your advisor for drinks and revising your English at the end.

Bar Charts

Bar charts, also called GANTT Charts are easier to produce

You can create a simple version simply with a word processor or a spreadsheet software:

The horizontal axis is organized either by days, weeks or month (depending on the size of the project). For a master thesis we suggest to use weeks or month.

The vertical axis includes a list of work packages (WPs) and milestones.

You then can fill in the table like this:

  • use "XXX"” during the weeks you plan to work hard
  • use "xxx" during the weeks you plan to work a bit on it


Simple bar chart with an HTML table

WPs and Milestones oct 6 08 oct 13 08 oct 20 08 oct 27 08 ... ... ... ... ... ... ... jun 1 09
Exploration of the subject area xxxxxxxxxx
.....
Preliminary case study XXXxxx
Research plan M
.....
.....
Writing it up x xxx XXXXXXXXXX

Controlling

If you plan without planning to use this plan, forget it. You only will loose your time.

By whom ?
  • In industry it's the boss or the project group as a whole that does it.
  • Depending on the educational institution it's you mostly, but you may give it to your advisor or integrate it into the research proposal.
Progress monitoring

I suggest to compare reality with planning about once / month (or once/week if you thesis must be completed in just a few month.

If there are important deviations from schedule, you should understand why and take corrective action.

Crisis management
  • Ask help from your advisor
  • Negotiate how to do less
  • Adapt the approach for something that is less costly

Duration of a typical master thesis =

(adjust to your institution and type of work)

Below is an example for a qualitative field-study. Estimations are in man/month. So divide by the % of time you can spend on the thesis.

Tasks (large WPs) By element Total
Find a subject and do the research plan 1 month
Literature review and initial writing 1 month
Contact each research site 1/2 day 1 month
Site visits 1 day
Coding of data 2-3 days 1 month
Analysis (matrices and visualizations)
Draft thesis 1 month
Revisions 1 month
Total 6 month

Icon-hand-right.png It is likely to be over-optimistic

Icon-light-bulb.png Select as little cases you can get away with if you do a qualitative study or rather adopt a quantitative approach.